The homes at 10033 42nd Avenue SW


- N o v e m b e r    2 0 0 3 -

D A T E

D E S C R I P T I O N

November 4, 2003 Joe Habenicht and his crew from JM Asphalt graded the area behind the homes, and then paved the asphalt driveways for both homes.   Gale Insulation came out and blew in the attic insulation for both homes.  Steve and Rick continued work on the interior painting.
November 14, 2003 Tongue and groove wood flooring has been installed in the kitchen and dining areas of both homes.   Kitchen cabinets have been installed.  Brian and Ron have started work on the interior window and door trim.  The front porch rails are now complete and awaiting paint.
November 21, 2003 First snow.  A light dusting of snow falls in Seattle.
   