D A T E |
D E S C R I P T I O N |
| September 1, 2003 |
Labor Day! No work today. |
| September 3, 2003 |
Woodinville Truss delivers custom pre-manufactured roof trusses for both
homes. Fred Olsen and his crew returns to assist with the installation of the
trusses on the north house. |
| September 4, 2003 |
Brian and his crew complete installation of roof trusses on the south
house, and spend Friday installing the roof sheeting. Well on schedule at this
point, they even had time for some crew photos. |
| September 8, 2003 |
A lot of activity for a Monday! Stoneway Roofing
delivered roofing materials in preparation for arrival of the roofing crew. The next
delivery was from Milgard Windows with the custom
made windows for both homes. The Honey
Bucket people made their weekly visit. A load of gravel was delivered to cover
the floor of each garage prior to the concrete work, and Ron got the job of spreading
gravel and digging two large holes to connect the water service for each house. |
| September 10, 2003 |
The four person roofing crew installed the roofs for both homes in ONE
day! They are an amazing group of folks to watch. They appear very much at ease as
they work right at the edge of a two story roof in a light drizzle! They will return
later to complete the porch roof on the south house. Different colors of roofing
material were selected to make each of the homes more unique. Ron installed the
steel re-bar for the garage floor concrete work, and the team installed quite a few of the
new windows in the south house. Brian got a much deserved day off to play in a golf
tournament. |
| September 11, 2003 |
The concrete workers poured the floors for both garages, while the Upright
team spent most of the day working on installing windows in both homes and completing the
covered porch on the south home. Tom and Ward from Paris Plumbing began the plumbing work
on the north home. After a record breaking warmer than normal Seattle summer (61
consecutive days above 70 degrees), Thursday was the first truly rainy day on the
job. Bring out the raincoats! Fall is almost here. |
| September 25, 2003 |
Lots of activity since the last update. Ward and Tom from Paris
Plumbing have almost completed the plumbing for both homes. They still have several
days of work left, and will return to install the fixtures after the drywall is installed.
The siding crew has been on site for a couple of days and is working on both
homes concurrently. They will likely be done in a few days. Oscar, one of the
neighborhood cats, keeps a watch when no one is around. |
| September 26, 2003 |
The siding crew continues to make good progress. A large dumpster
was delivered for collecting construction debris. Ward ended up working solo Friday,
and the HVAC folks continued installation of the ductwork. |
| September 29, 2003 |
Siding is complete on the north home except for the area under the covered
porch which will be completed later. Siding work continues on the south home.
Brian and Ron spent the day working on additional interior framing. The
mechanical crew continued work on the HVAC systems. |
| |
|
| |
|